A step-by-step guide on using the MORE Platform for Registrations for Submissions of device related incidents.
Similar Posts
Guidance: Route B substantial modification pilot
Clinical trials Route B substantial modifications pilot starts on 1 October 2025. Prepare for the implementation of new regulations from 28 April 2026.
Field Safety Notices: 1 to 5 September 2025
List of Field Safety Notices from 1 to 5 September 2025.
First major overhaul of medical device regulation comes into force across Great Britain
New Post-Market Surveillance (PMS) regulations have taken effect across Great Britain, requiring medical device manufacturers to proactively monitor the safety and performance of their products once on the market.
Class 2 Medicines Recall: Paracetamol 500mg Tablets, Chelonia Healthcare Limited, EL(25)A/25
Chelonia Healthcare Limited is recalling specific batches of Paracetamol 500mg Tablets (100 pots) as a precautionary measure due to contamination following a small number of complaints of discoloured tablets within the pots.
Consultation on Medical Devices Regulations: Routes to market and in vitro diagnostic devices
The MHRA is inviting members of the public to provide their views on proposed changes to the regulatory framework for medical devices.
Cancel a medicine’s marketing authorisation or other licence
Cancel a marketing authorisation, traditional herbal registration or parallel import product licence or withdraw a pending submission.
